ELEVATED MODULE STOWAGEProject SummaryIn June 2011, the project cargo ship EOT SPAR was to load more modules than its hold could carry. An elevated stowage was designed using simple vertical ladders and heavy support beams in way of the module support points. The system was designed based on readily available materials and such that it could easily be installed, removed, and re-used, if needed. Scope of WorkThe project scope included:Project PhotographsPhotographs courtesy of GJWermuth Marine Consulting LLC. |
■ | Designing the elevated module support concept;
|
■ | Provide detailed shop drawings for fabrication and installation:
|
■ | FE analysis of the vertical ladder support.
|