Project Summary

In April 2010, the captain of the relatively new bulk carrier CIELO DI TOKYO became concerned about a relative 18 mm deflection of one of its ship's hatch covers, after loading some yachts in Ensenada. A survey showed that the seal between the hatches was in good order and the seam was still watertight. An on-site calculation showed that the concentrated weight of the loaded yachts could not be the cause of this deflection. Instead, the deflection was likely either casued by a previous (excessive) deck load, or built in at the shipyard during construction.


Scope of Work

The project scope included:


   


Project Photograph















specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

On site survey of the hatches, seals and coamings;
Calculate the total deck load on the hatch cross beam;
Compare the calculated total deck load with the design load of the green water on the hatch cover;
Verify the support and lashing concept of the yachts.
Deflected hatch cover bulkcarrier
Deflected hatch cover on the CIELO DI TOKYO