HIBERNIA MODULES LOAD-OUT



Project Summary

In November 1994, a total of six Hibernia sub-modules were loaded onto the ocean-going barge AMT DISCOVERER at the Finland Industries construction yard in Marystown, Newfoundland. The weight of the modules ranged from 150 to 250 t. For the load-out, self-propelled hydraulic dollies were used. These dollies were positioned under the strong points of the sub-modules. Special truss work type support frames were used for the drill floors.

Scope of Work

The project scope included:



   


Project Photographs














specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Review of final load-out procedures;
On-site assistance during the actual loading operations;
Structural analysis of the load-out frame for the drill floor modules.
Loading out drill module
Loading out drill floor module onto the barge AMT DISCOVERER
Rotating the first module
Rotating the first module
Second module rolled on
Second module rolled on
Last module reaching bridge plates
Last module reaching bridge plates
Last module in position over grillage
Last module in position over grillage