HIBERNIA MODULES LOAD-OUTProject SummaryIn November 1994, a total of six Hibernia sub-modules were loaded onto the ocean-going barge AMT DISCOVERER at the Finland Industries construction yard in Marystown, Newfoundland. The weight of the modules ranged from 150 to 250 t. For the load-out, self-propelled hydraulic dollies were used. These dollies were positioned under the strong points of the sub-modules. Special truss work type support frames were used for the drill floors. Scope of WorkThe project scope included:Project Photographs |
■ | Review of final load-out procedures; |
■ | On-site assistance during the actual loading operations; |
■ | Structural analysis of the load-out frame for the drill floor modules. |