In September 1999, the DOCK EXPRESS 12 delivered three 4-th generation container cranes to the Phase II extension of the Freeport Container Terminal, Freeport, Bahamas. The cranes were built by Hyundai Heavy Industries in Korea and Dockwise was contracted for the delivery. Because of the Panama Canal passage with its 205 ft height restriction for the Bridge of the Americas, these cranes were transported only partly erect, with their fully assembled top sections temporarily secured low between the legs at different levels to allow for efficient nesting of the cranes.

Argonautics Marine Engineering, Inc. was hired to supervise the offloading. After removal of the boom supports and tie downs, the 1,100 t cranes were skidded aft over the ship's outriggers until the crane's landside sill beam could be lowered onto a set of jack boogies, which moved the crane further over the quay. Once in position, the waterside sill beam was temporarily supported by wood blocks, enabling the ship to move forward. The waterside was then picked up again and the waterside trucks could be rotated and lowered onto the rails. The landside was then jacked up for installation of the landside trucks after which these were also lowered onto the rails. After 2 days preparations, these three cranes were offloaded in 3 consecutive days.

Scope of Work

The project scope included:



   



Project Photographs














specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Coordination of activities during offloading;
Liaison with ship crew, client and its subcontractor;
Setting-up of rail track and jacking boogies as per the Dockwise Offloading Procedure;
Provision of on-site supervision during offloading operation.
Dock Express 12 arrives with 3 Hyundai container cranes
DOCK EXPRESS 12 arrives in Freeport with the partly erect container cranes
Dock Express 12 arrives at the terminal
Dock Express 12 arrives at the terminal
Offloading second crane
Offloading second crane
Rotating waterside truck
Rotating waterside truck
Last crane ready to be offloaded
Last crane ready to be offloaded