Project Summary

In August 2011, Argonautics Marine Engineering, Inc. provided on-site assistance during the offload of 4 Moisture Separator Reheaters (MSRs) delivered by cargo barge to the St Lucie Power Plant in St. Lucie, FL. Earlier in the year, detailed ballast procedures were prepared for the live rolling-off of each of the 4 MSR, using 10 axle Kamag trailers. Only days before the offload, a different barge was used for the MSR transport, requiring a quick re-do of these ballast procedures.  

During the offload operations, on-site support was provided to the offload contractor. Thunderstorms delayed the preparations, but once offloading started, all 4 MSRs were safely offloaded and parked in an adjacent parking lot in a single day. 

Scope of Work

The project scope included:


   


Project Photographs














specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Detailed ballast procedures for each of the 4 MSRs;
Re-do ballast procedures for the new barge;
Provide on-site assistance during the actual offload operations.
MSR rolled off over steel ramp
First MSR partly on the ramp
Rolling off first MSR
Rolling off first MSR
Rolling off second MSR
Rolling off second MSR
Re-installing ramp on starboard side
Re-installing ramp on starboard side
Parking last MSR on supports