In July 1993, port equipment including 6 transtainers and 2 container cranes were transported from Portland and Los Angeles/Long Beach to Nanjing, China. The transtainers were rolled on over the stern in Portland, OR. The Starporter crane (weighing approx. 650 t) was loaded in Los Angeles, after which the ship shifted to Long Beach for loading of the Peiner crane (weighing approx. 950 t). The cranes were skidded on and off over the side of the transport vessel, using tracks and skid shoes. The skid shoes housed hydraulic jacks for lifting the cranes. After loading, the cranes were secured to the deck with steel pipes.

Argonautics Marine Engineering, Inc. was hired to supervise the loading operations in Los Angeles and Long Beach. Upon arrival in Nanjing, Argonautics Marine Engineering, Inc. also supervised the offloading operation.


Scope of Work

The project scope included:



Project Photograph













specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Liaison with ship crew, client and its offloading contractor;
Supervision of the offloading of all equipment upon arrival in Nanjing, China.
Skifdding crane off over the side