REVIEW OF LASHING OF A 800 T HUISMAN MAST CRANE



Project Summary

In February 2006, a Huisman 800 t heavy-lift mast crane was loaded onto the container vessel PANGANI for transport from Schiedam, the Netherlands, to Shanghai, China. The grillage and lashing arrangements were designed based on standard Germanisher Lloyd's requirements, which were compared to the IMO guidelines for lashing of heavy cargoes on board container ships. The 635 t heavy mast crane was successfully loaded using 2 floating shear leg cranes, secured, and after an uneventful voyage safely delivered in Shanghai.  
      

Scope of Work

The project scope included:





Project Photographs

Photographs courtesy of MatthewsDaniel.














specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Verify the motion/acceleration criteria for the transport;
Review proposed grillage and lashing arrangements;
Provide guidelines for the local surveyor.
Huisman mast crane stowed on transport vessel
Huisman mast crane loaded on the M/V PANGANI