RIDLEY STACKER/RECLAIMER TRANSPORT



Project Summary

A large Sandvik stacker/reclaimer was needed for the expansion of coal export operations at Ridley Terminals Inc. For the transport from China to Canada, the project cargo ship HHL MACAO was selected which required the stacker/reclaimer to be shipped partly disassembled. The heaviest part, the portal, weighed 560 t. Argonautics Marine Engineering, Inc. provided the initial lift plan, stowage plan, design ship motions and accelerations, and the lashing plan. For the transshipments onto local barges, stowage and lashing plans, and stability calculations were provided, followed by ballast procedures for the roll-off operations. The heavy-lift ship arrived at Prince Ryupert on November 15, 2012, after which the various parts were lifted off the ship directly onto the local cargo barges. The barges were towed to the terminal and all parts where successfully rolled off using SPMTs.     


Scope of Work

The project scope included:





   



Project Photograph

Photographs courtesy of HANSA Heavy Lift GmbH and Mammoet Canada Western Ltd.















specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2013 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Model project vessel and provide stowage arrangent and concept lift plan;
Determine design environmental criteria for the transport;
Calculate resulting ship motions and resulting inertia loads on the stacker/unloader parts;
Provide lashing plan for all parts;
Provide stowage plans for the parts on various cargo barges;
Check the intact and damaged stability of the loaded cargo barges;
Provide step-by-step ballast procedures for the SPMT roll-off operations of the large parts. 
Barge loaded with cranes departs from Newark
HHL MACAO berthed at Porpoise Harbour to offload stacker parts onto barges