SKYWAY SLED TRANSPORT



Project Summary


In December 2006, four so-called sleds (self walking winch frames, used to lift the concrete bridge sections into place) were transported from the San Francisco Bay to Ingleside, TX, during the mobilization tow of the cargo barge LUCKY LOGGER. The narrow based and top heavy sleds (each weighing approx. 100 t) were lifted onboard and were secured to the grillage using angle bars and steel plates. The grillage was pre-installed on the barge for the transport of the T1 footing which was to be picked up at Ingleside. Some small flange sections of the grillage were removed to be able to nest the sleds tight against the main grillage beams.

In addition to the 4 sleds, 10 wire spools were also transported. These were stowed and secured inside the grillage structures. 

Scope of Work


The project scope included:




   




Project Photographs

   











specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Establish design criteria for the tow to Ingleside;
Stability and barge motion analyses;
Design of seafastenings and lashings of the sleds and the spools;
On-site assistance during loading and securing of all cargo items;
Prepare Panama Canal transit drawings.
Sled lowered to deck
Sled lowered to deck
Securing of the first sled
Securing of the first sled
A tight fit beteeen the existing grillage
A tight fit beteeen the existing grillage
Spools stowed inside grillage
Spools stowed inside grillage
Sleds stowed on the Lucky Logger
The sleds stowed on the LUCKY LOGGER