The Transocean owned jack-up rig TRIDENT IV was dry towed from Angola to the Zadar Yard in Croatia on the semi-submersible
cargo barge ZHONG REN 3. The rig carried legs with a length of 125 m (410 ft) each. An independent barge motion response
analysis demonstrated that the design accelerations resulted in leg bending moments which were still within the maximum allowable
moments. After a successful loading and seafastening operation, the barge departed Angola on May 24, 2004.      
      

Scope of Work

The project scope included:





Project Photographs

Photographs courtesy of Hydrographic and Marine Consultants BV.











specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2012 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Provide design environmental criteria for the tow route;
Calculate design barge motions and accelerations;
Calculate design linear point accelerations at various levels above deck.
Trident 4 departing on the Zhong Ren 3